The Process

From First Call to
SEAI Grant Paid — Explained.

No jargon. No surprise steps. Here's exactly what happens from the moment you get in touch to the day your solar panels are generating free electricity.

☀️ Start With a Free Estimate or 📞Call Conor083 305 3845
Solar installation team on roof Ireland
REPLACE: Team on roof mid-installation — panels going up
Step by Step

What Happens, and When

Most installations go from first contact to completed system in 4–8 weeks. Here's every step.

Day 1
1

Free Estimate — Online or by Phone

Use our savings estimator or call Conor directly. In 2 minutes you'll have a rough savings figure, system size recommendation, and SEAI grant amount. No commitment, no pressure.

What we need from you: Your county, rough annual electricity bill, whether you own your home, and when it was built. That's it.
REPLACE: Conor at laptop or on the phone — approachable, professional
Week 1–2
2

Free Home Survey

Our qualified engineer visits your home to assess your roof — pitch, orientation, shading, structural suitability. We also check your consumer unit and meter setup. Takes about an hour.

What happens at the survey: We measure your roof, check for shading from trees or chimneys, confirm your SEAI eligibility, and design the exact system for your home. You get a firm quote — no estimates.
REPLACE: Conor on roof surveying — measuring or assessing roof angle
Week 2–3
3

You Approve the Quote

We send a detailed written quote — system spec, panel brand, inverter model, everything included. No hidden costs. When you're happy, you confirm and we schedule your install date.

What's in your quote: Panel count and brand, inverter spec, mounting system, all cabling and hardware, SEAI grant paperwork, grid connection application, monitoring setup, and a 10-year workmanship guarantee. All in.
Week 3–4
4

We Register Your SEAI Grant

Before any work begins, we submit your SEAI grant application on your behalf. This is a legal requirement — the grant must be registered before installation. You don't fill in a single form.

What you do: Sign one authorisation letter allowing us to apply on your behalf. That's the full extent of your paperwork involvement.
Week 4–6
5

Installation Day

Our team arrives early and gets to work. Most domestic systems are completed in a single day. Larger systems or those including battery and EV charger may take two days. We leave the site clean.

On the day: You don't need to be on the roof — just available to let us in and check in at the end. We'll walk you through the system, show you the monitoring app, and answer every question before we leave.
REPLACE: Team on roof mid-installation — panels going up, safety gear, professional
After Install
6

Grid Connection & SEAI Inspection

We handle the ESB grid connection paperwork so you can legally export electricity. SEAI then schedules an inspection — typically within 2–4 weeks of installation. We attend on your behalf.

The inspection: An SEAI assessor checks the installation meets standards. We've never failed an inspection — because we build to spec every time.
Week 8–10
7

SEAI Grant Paid Into Your Account

After a successful inspection, SEAI pays your grant directly to your bank account — up to €1,800 for panels, plus €600 if you added battery storage. Typically 4–6 weeks after installation.

The result: Your system is live, generating free electricity, exporting surplus for income, and your grant is in your account. From here, you just watch the savings accumulate.
After Installation

We Don't Disappear After the Install

Your system comes with ongoing support, monitoring, and warranties that actually mean something.

📱

Remote Monitoring

Track your generation, consumption, and export in real time from the monitoring app. See your savings accumulate daily. We can remotely diagnose any issues.

🛡️

25-Year Panel Warranty

All panels we install carry a 25-year performance guarantee from the manufacturer. Inverters carry a 10-year warranty. Our workmanship is guaranteed for 10 years.

📞

Ongoing Support

Call or WhatsApp Conor directly if anything needs attention. We're not a call centre — you deal with the same person who installed your system.

💰

Export Income Setup

We set up your Clean Export Guarantee (CEG) registration so you're paid for every unit you export to the grid — from day one after install.

🔧

Annual Check Option

We offer an optional annual system health check — inspect mounting fixings, check cable connections, clean panels if needed, and verify inverter performance.

📈

Expansion Ready

Want to add battery storage later, or more panels? We design every system with expansion in mind — no ripping out and starting over.

Ready to Start?

Step 1 takes 2 minutes.
Find out what you'll save.

Use our savings estimator or call Conor directly. No obligation, no pressure — just honest numbers for your home.